Proper installation is critical:
Room Interface Requirements
HVAC, electrical, monitoring, and mechanical system connections.
HVAC Integration
Coordinate airflow with cleanroom HVAC system.
Control Systems Connectivity
Interface with cleanroom networks and data systems.
Validation Testing
Verify airflows, filtration efficiency, and particle removal performance.
Operating and Maintaining Dust-Free Air Showers
Follow stringent procedures:
Staff Training on Proper Use
Educate personnel on appropriate operating protocols.
Certification and Re-Testing Schedule
Re-validate every 6 months to maintain performance.
Filter Replacement Protocol
Replace based on pressure drop measurements.
Cleaning and Disinfection Procedures
Follow manufacturer cleaning procedures to avoid re-entrainment of contaminants.