Air Shower Clean Room

Cleanroom Service: Design, Build and Install. Clean Room Equipment and Supplies: Modular Clean Room, Air Shower

Lithium Battery Industry Workshop Air Shower Selection Points

Due to the specificity of each industry's production and products, the selection of air showers is not the same. When we recommend air showers to our customers, we select them according to their product attributes, production environment and the number of personnel.Easy Install Prefabricated Folding Container House


Lithium Battery Industry Workshop Air Shower Selection Points


Some special industries, such as the production of lithium battery production workshop air shower selection is completely different from the ordinary workshop air shower, the ordinary workshop air shower is to improve and ensure the cleanliness of the workshop, the staff channel into the workshop before the installation of air shower, the main purpose of the air shower here is to ensure that the personnel to prevent dust into the workshop.Cleanroom: How It Differs


The lithium battery industry is the opposite, because the battery production does not need too high cleanliness, generally enter the workshop is not required to air shower.


As the lead dust in the lithium battery production workshop can cause harm to human body, it is generally necessary to blow through the air shower when taking a break or going to work in order to remove the lead dust from the personnel in order to prevent harm to the outside environment and employees' bodies.How to Clean the Surface of 304 Stainless Steel Air Shower Room


So as this reverse dust removal air shower, what elements should be in the selection?


1, the wind speed of the air shower must be large, because the lead dust is heavy, because there must be enough wind speed to blow off the lead dust on the staff, it is generally recommended that the wind speed > 30 m / s is better.


2, the floor of the air shower must be hollowed out, the reason is still because the lead dust is heavy, can not be carried by the airflow to the air filter, the floor hollow design, the floor below the non-woven filter bag is set, so as to facilitate the attraction of lead dust.


3, the air shower needs to be installed with a water catching tray, and a water catching tray needs to be set under the floor, so that the lead dust falls into the water and then enters the chemical treatment pool through a special waterway for harmless treatment.


More of your interest



Air Shower Technical Specifications
How Does An Air Shower Operate?
Air Shower Design And Application Guidelines
Air Shower Wind Speed Size And Air Shower Dust Removal Effect
Manual Door Air Shower To Extend The Service Life
How To Determine The Installation Site Of The Cargo Air Shower
Clean Room Air Shower And Transfer Window
Air Shower Blowing System Details
Notes On The Installation Of Air Shower
Determinants Of Air Shower Performance


cache
Processed in 0.004734 Second.